• Project name: Stage 1 of Yongxing County Qingshanlong Reservoir diversion project

Owned subsidiary, Hunan Huayu Water Co., Ltd., as a BT investor, is responsible for the investment and construction of the project. The construction period of the project is short and the construction is difficult. The installation and construction of the water pipeline is 35km long. The terrain address is complex and the terrain is high and low. It needs to pass through the farmland and other pipelines, so the financing, technology and management ability are fully utilized. Ensure the construction funds, optimize the design and strengthen the construction management, high-quality projects delivered to the owners on schedule, access to the owners praise.